Our Packages

Standard

$15,990

+GST
  • Design consultation at our showroom & onsite accurate measure
  • Liason with all trades on your behalf (plumbing, electrical, tiling, carpentry, plastering, waterproofing)
  • Demolition & rubbish removal
  • Installation of chosen fixtures from our standard range
  • Wall Tiling (1800 in shower & 1200 rest of bathroom) in white 300 x 600mm rectified tiles
  • High quality porcelain floor tile at 300mm x 300mm from our standard range
  • Updating of existing light switch and powerpoint
  • Semi – frameless shower screen
  • Back to the wall toilet
  • Tapware from our standard range
  • 750mm vanity from our standard range
  • Standard accessories pack
Contact Us!

Frequently Asked Questions

  • Design consultation at our showroom & onsite accurate measure – by appoint- ment only
  • Liaison with all trades on your behalf (plumbing, electrical ,tiling, carpentry, plastering)
  • Project Management
  • Waterproofing
  • Demolition & rubbish removal
  • Installation of chosen PC items from the various selections.
All items need to be at the job before work commences to ensure that there are no delays with completion dates.
We will do all we can to accomodate you so that you will not need to move out. If you do not have a second bathroom, you may hire and toilet and shower through us for the duration of the renovation. If you wish to move out for this time you may.
It is good to be closeby if you can, to be available make final decisions towards the end of the job (ie where PC items should be placed). Our trademen are work cleanly and are trustworthy should you need to be out during the process.
No, our project manager will organise all of these to make the process hassle free for you.
It can be quite costly to make changes to any of your chosen fixtures after installation work has begun, so it is important to make final selections before the project begins. Talk to your project manager if you have concerns about a choice you have made and he will see if it is an easy swap (ie a change in hand rail) as your satisfaction is important to us, with larger item changes ie (different cost of vanity or alterations to plumbing or electrical), this may be more difficult and greater costs will be incurred.
Once a contract for your bathroom renovation a has been discussed and signed and payment of a %5 deposit has been made, we will book a date in to begin your bathroom. Your bathroom will be completed in 3 weeks from this date. If you have opted for customised accessories which are not within our standard ranges, lead times may vary subject to delivery of specific items.
• A HIA bathroom survey in 2015 found that an average new bathroom renova- tion cost $15, 247 – If you are looking for a low cost renovation this is a good estimation of the cost you will need to be prepared to pay.
• Above all bathrooms bathrooms are generally around $17,000 – $24 ,000, but can be made less or more depending on the quality of fixtures you are after and the degree of remodelling require.
• Bathroom Renovations generally increase in price by around 3.5% ($500) each year which means that the longer you put off undertaking the renovation the higher the costs will be.